Leonie Parc View Building Progress Update
(As at 2 June 2008)

No.

Description

Progress Status

1

Foundation Works

2

Sub-structure RC Works

3

Super-structure RC Works

4

Brick Walls

5

Unit Internal Works

 

 

- Window and Doors

 

- Plastering

 

- Ceilings

 

- Tilings

 

- Timber floorings

 

- Paintings

6

External Works, Common Areas & Facilities

7

TOP Status

 

 

- Application for authorities inspection

 

- Authorities conduct final inspections

 

- Authorities issue TOP Certificates/Clearance

 

- Building Control Authority issues TOP


Completed
In-Progress
Nil

Below are pictures of the ongoing works at the Leonie Parc View site:

1. 6th storey slab in progress.

2. Another view of the 6th storey slab.

3. Lift and household shelter wall at 7th to 8th storey. Formwork in progress.

4. Timber formwork at 4th storey dismantled.

5. Sanitary and water pipes sleeves installed at 6th storey slab.

6. Plastering and installation of glass blocks and electrical conduits at electrical sub-station.

7. Laying of brickwalls at 1st storey in progress.

8. Installation of concealed electrical conduit and power points at 5th storey columns.